Projects

Street Improvement Projects


Current Projects

  • 2021 Airport Tract LED Conversion
    • Project consists of converting the existing series lighting system to Multi-Volt lighting system by installing new conductors, conduit and pull box system. Along with the installation of LED luminaires. Project Area is bounded by New Ave to the east, Valley Blvd to the north, Almansor St to the west and Ross Ave to the south.
  • Fremont Ave; 6.6 Series to Multiple Circuit Conversion
    • Project consists of converting the existing series lighting system to Multi-Volt lighting system by installing new conductors, conduit and pull box system, as well as the installation of LED luminaires. Project Area is along Fremont Ave (between Main St & Poplar Blvd)

‍‍Future Projects


  • Five Year Plan
  • FY 21-22 SB1 Street Rehabilitation Project 

  • FY 22-23 SB1 Street Rehabilitation Project 

  • 2022 CDBG Street Improvements Project

Completed Projects